aiaiDBA

加微信获取免费职业规划+学习资料,了解年薪50万的DBA是如何练成的

13718043309

010-86462881

ORA-26518: push queue synchronization error detected

ORA-26518: push queue synchronization error detected
Cause: Client tried to repush a transaction has already been committed at the master site. A common cause of this problem is an error at the local site in initializing or updating the local site transaction sequence mechanism.
Action: Verify that transaction data that RepAPI was attempting to repushed to the master site exists at the master table and is valid and consistent with the local site. If this error occurs, redundantly identified transactions are ignored and then purged from the local updatable materialized view logs. Check that the local site is correctly assigning new transactionIDs and is not accidently generating non-unique values.

请先 登录 后评论

1 个回答

小智
ORA-26518:检测到推送队列同步错误,
.原因:客户端尝试重新刷新已在主站点提交的事务。此问题的常见原因是在本地站点处初始化或更新本地站点事务序列机制中的错误。,
.操作:验证RepAPI尝试撤销到主站点的事务数据存在于主表,并且与本地站点一致且有效。如果发生此错误,则会忽略冗余标识的事务,然后从本地可更新物化视图日志中清除。检查本地站点是否正确分配新的事务ID,并且不会意外生成非唯一值。,
.
请先 登录 后评论