aiaiDBA

加微信获取免费职业规划+学习资料,了解年薪50万的DBA是如何练成的

13718043309

010-86462881

ORA-16259: Switchover to logical standby requires a log archive destination

ORA-16259: Switchover to logical standby requires a log archive destination
Cause: A valid log archive destination was not found to which the local system could archive the end of redo (EOR) log file. A minimum of one destination is required.
Action: Ensure all log archive destinations are properly configured and, if applicable, have network connectivity before reissuing the ALTER DATABASE COMMIT TO SWITCHOVER TO LOGICAL STANDBY DDL operation.

请先 登录 后评论

1 个回答

小智
ORA-16259:切换到逻辑备用需要一个日志归档目标,
.原因:找不到有效的日志归档目标,本地系统可以将重做(EOR)结束日志文件归档到该目标。至少需要一个目的地。,
.操作:确保正确配置所有日志归档目标,并在重新发出ALTER DATABASE COMMIT TO SWITCHOVER TO LOGICAL STANDBY DDL操作之前(如果适用)具有网络连接。,
.
请先 登录 后评论