aiaiDBA

加微信获取免费职业规划+学习资料,了解年薪50万的DBA是如何练成的

13718043309

010-86462881

PGA-20967: 2-phase commit recovery attempted, DBA action required

PGA-20967: 2-phase commit recovery attempted, DBA action required
Cause: The recovery process of the Oracle integrating server has connected to the gateway to perform recovery. However, the gateway cannot perform automatic recovery for this transaction due to unknown heuristic action taken by the target OLTP.
Action: The DBA must attempt to manually resolve the in-doubt transaction. Detailed information on how to proceed is contained in Chapter 8 of the Oracle Database Gateway for APPC Installation and Configuration Guide, in the section titled "Manual Recovery of In-Doubt Transactions".

请先 登录 后评论

1 个回答

小智
PGA-20967:尝试进行两阶段提交恢复,需要DBA操作,
.原因: Oracle集成服务器的恢复过程已连接到网关以执行恢复。但是,由于目标OLTP采取的未知启发式动作,网关不能对此事务执行自动恢复。,
.操作: DBA必须尝试手动解决不确定事务。有关如何进行的详细信息,请参见“Oracle数据库网关APPC安装和配置指南”的第8章“手动恢复疑难解答”一节。,
.
请先 登录 后评论